Sutton Role:
LEED Commissioning Authority – Sutton providing Complete the following commissioning (Cx) process activities for mechanical, electrical, plumbing, and renewable energy systems and assemblies, in accordance with ASHRAE Guideline 0-2005 and ASHRAE Guideline 1.1–2007 for HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability. Requirements for exterior enclosures are limited to inclusion in the owner’s project requirements (OPR) and basis of design (BOD), as well as the review of the OPR, BOD and project design. NIBS Guideline 3-2012 for Exterior Enclosures provides additional guidance.
Sutton Commissioning Authority (CxA) Review the OPR, BOD, and project design, Develop and implement a Commissioning Plan, Confirm incorporation of Cx requirements into the construction documents, Develop construction checklists, Develop a system test procedure, Verify system test execution’ Maintain an issues and benefits log throughout the Cx process, Prepare a final Cx process report, Document all findings and recommendations and report directly to the owner throughout the process.
Client:
Project Details:
The new workspace features a large atrium opening and skylight installation, includes a variety of collaboration spaces, fully equipped gym, yoga studio, data centre, roof top garden and padel/tennis court.